[{"data":1,"prerenderedAt":155},["ShallowReactive",2],{"navigation":3,"\u002Fdocs\u002Frera-compliance-guide":40,"\u002Fdocs\u002Frera-compliance-guide-surround":150},[4,8,12,16,20,24,28,32,36],{"title":5,"path":6,"stem":7},"Getting started","\u002Fdocs\u002Fgetting-started","1.docs\u002F1.getting-started",{"title":9,"path":10,"stem":11},"Core concepts","\u002Fdocs\u002Fcore-concepts","1.docs\u002F2.core-concepts",{"title":13,"path":14,"stem":15},"Sales & CRM guide","\u002Fdocs\u002Fsales-crm-guide","1.docs\u002F3.sales-crm-guide",{"title":17,"path":18,"stem":19},"Construction progress guide","\u002Fdocs\u002Fconstruction-progress-guide","1.docs\u002F4.construction-progress-guide",{"title":21,"path":22,"stem":23},"Payments & collections guide","\u002Fdocs\u002Fpayments-guide","1.docs\u002F5.payments-guide",{"title":25,"path":26,"stem":27},"RERA compliance guide","\u002Fdocs\u002Frera-compliance-guide","1.docs\u002F6.rera-compliance-guide",{"title":29,"path":30,"stem":31},"Exports & audit trail","\u002Fdocs\u002Freports-and-exports","1.docs\u002F7.reports-and-exports",{"title":33,"path":34,"stem":35},"Roles & permissions","\u002Fdocs\u002Froles-permissions","1.docs\u002F8.roles-permissions",{"title":37,"path":38,"stem":39},"Frequently asked questions","\u002Fdocs\u002Ffaq","1.docs\u002F9.faq",{"id":41,"title":25,"body":42,"description":144,"extension":145,"meta":146,"navigation":147,"path":26,"seo":148,"stem":27,"__hash__":149},"docs\u002F1.docs\u002F6.rera-compliance-guide.md",{"type":43,"value":44,"toc":137},"minimark",[45,49,54,62,78,91,95,100,107,115,119,126],[46,47,48],"p",{},"Construvex is structured the way RERA registration works in India, so the data you record\nday-to-day already lines up with how your project is assessed.",[50,51,53],"h2",{"id":52},"rera-configuration-organization-wide","RERA configuration (organization-wide)",[46,55,56,57,61],{},"Every organization has one RERA configuration, managed from ",[58,59,60],"strong",{},"Settings → RERA Config",". It controls how construction progress rolls up for every project in the org:",[63,64,65,72],"ul",{},[66,67,68,71],"li",{},[58,69,70],{},"RERA categories"," are the standard construction stages RERA expects you to report on (excavation, plinth, stilt floor, super structure slabs, internal works, sanitary fittings, staircases\u002Flifts\u002Flobbies, external works, and installation & finishing). You can reorder them and rename their display labels for your organization, but the underlying codes stay fixed because payment triggers and progress data are wired to them.",[66,73,74,77],{},[58,75,76],{},"Scope weights"," are a slider that sets how much building-level progress versus phase-level infrastructure (roads, common amenities, etc.) contributes to a phase's overall completion percentage. The two must always add up to 100%.",[79,80,81],"blockquote",{},[46,82,83,86,87,90],{},[58,84,85],{},"Note:"," Changing categories or weights here affects progress calculations org-wide, not just one project. Use ",[58,88,89],{},"Reset to Defaults"," if you want to undo customizations and return to the standard RERA set.",[50,92,94],{"id":93},"phases-mirror-your-registrations","Phases mirror your registrations",[96,97],"illustration",{"alt":98,"src":99},"One project splits into two phases. Each phase card carries its own RERA registration number, its own status, its own buildings and its own overall percentage and quarterly progress report, so a later phase can be registered without disturbing the filings of an earlier one.","\u002Fillustrations\u002Ffeature-rera-registrations.svg",[46,101,102,103,106],{},"In India, each ",[58,104,105],{},"phase"," of a project is typically its own RERA registration, with its own RERA\nnumber and its own filings. Construvex treats phases as first-class for exactly this reason: set\nyour phases up to match your real registrations, and everything beneath them (buildings, units,\nprogress, deals, collections) is already grouped the way you report it.",[46,108,109,110,114],{},"See ",[111,112,9],"a",{"href":113},".\u002Fcore-concepts"," for the full hierarchy.",[50,116,118],{"id":117},"progress-in-reras-own-categories","Progress in RERA's own categories",[46,120,121,122,125],{},"Because construction progress is recorded against the RERA categories configured above, the\npercentages you see per building and per phase are already in the categories your filings use, with\nno separate re-tallying when you need to report. The\n",[111,123,17],{"href":124},".\u002Fconstruction-progress-guide"," covers how progress is logged and\nhow it rolls up.",[46,127,128,129,132,133,136],{},"To take that data out of Construvex, for your RERA consultant, a state portal upload, or your own\nrecords, use the ",[58,130,131],{},"Export"," button on the phase progress screen. See\n",[111,134,29],{"href":135},".\u002Freports-and-exports",".",{"title":138,"searchDepth":139,"depth":139,"links":140},"",2,[141,142,143],{"id":52,"depth":139,"text":53},{"id":93,"depth":139,"text":94},{"id":117,"depth":139,"text":118},"Set up your organization's RERA categories and scope weights, and see how the Project → Phase → Building → Unit structure keeps your progress data aligned with how RERA registration actually works.","md",{},true,{"title":25,"description":144},"gyIs3bUk-mK6gnV6lfgxoOqXeKLfx1O3YNFpl-CbsIg",[151,153],{"title":21,"path":22,"stem":23,"description":152,"children":-1},"Set up payment plans, generate a collection schedule when a unit is booked, and track what's been received against what's due.",{"title":29,"path":30,"stem":31,"description":154,"children":-1},"Download your data as CSV, bring records in with bulk import, and pull the organization-wide audit trail for compliance reviews.",1789206849162]